Monday, July 26, 2010

Shitter Tank

It was a big day at Sherlin Manor. On top of a productive end to last week today was also a busy day on the hill. The rain last week slowed production on the septic system but it was dry and sunny today and the septic was installed. Some backfilling was also completed, most notably in the garage. With a little more backfill the main excavation should be done, with the exception of our large rock landscape wall. The electricians also started today. It was only the meter box and circuit box but at least it is done and Xcel can hook up our power tomorrow. The guys have the house all sheeted and the window openings cut out. The framing upstairs is nearly complete with the exception of the stairs and stairwell walls.

Framing up


Josh's huge shit tank

All sheeted up

Thatchman enjoying the view from his bedroom.

Breanna's Laundry Room

No comments:

Post a Comment